Every figure below was read off the agency's or utility's own published document on August 26, 2026. Fee schedules and tariffs change, and two of these carry known dating problems that are noted on the card. Confirm anything with a dollar sign by phone before you rely on it. Where a cost is not published by any official source, this page says so and gives you the number to call instead of an estimate.
Speculative Site Evaluation
$550
The pre-purchase soil and site evaluation on a parcel you do not own yet. The fee is creditable toward a later septic permit on that parcel. Requires the seller's written authorization for PHD to enter and for you to excavate. The application expires two years from the date of purchase.
Panhandle Health District · FY23 Environmental Health fee schedule · verify at (208) 415-5220
Subsurface Sewage Permit, New
$1,050
The installation permit itself. Expansion and repair permits are $400. A septic tank, vault privy, grey water sump or composting toilet permit is $250. Permit renewal, a two-year extension, is $50. The permit is not transferable between owners.
Panhandle Health District · FY23 fee schedule, no effective date on its face · confirm the current figure
Soil Read Turnaround
10 working days
PHD states a permit may take up to ten working days after you notify them the test holes are complete, or after the scheduled appointment. That clock starts after excavation, which has to be scheduled and can be stopped cold by frozen or saturated ground. A 30-day septic contingency is tight. Forty-five to sixty days is honest.
PHD Septic Application Guidelines · verified August 26, 2026
Domestic Well Drilling Permit
$75
Idaho Code § 42-235. Domestic and monitoring wells need only this permit, no water right, as long as you stay inside the § 42-111 limits. Other uses are $200 per permit. Irrigation, commercial, municipal and injection wells need an approved water right before IDWR will approve the drilling permit at all.
Idaho Code § 42-235 · Idaho Department of Water Resources
Avista Line Extension, Primary Circuit
$7.97-$10.35 / ft
Tariff Schedule 51. $7.97 per foot single-phase overhead primary plus $4,093 fixed per customer; $10.35 per foot underground primary plus $1,811 fixed. Maximum Allowance credit for a residential customer with at least 2,500 kWh/year of new load: $1,745. Design fee $150. Exceptional Costs, rock trenching, road bores, pavement, rights of way, are extra and are what blow up rural budgets.
Avista I.P.U.C. No. 28, Schedule 51 · sheets carry 2015 to 2016 issue dates, confirm the current sheet at (800) 936-6629
Domestic Exemption Ceiling
13,000 gal/day
Idaho Code § 42-111. No water right is needed for a home if the use stays inside both limits: irrigation of no more than one-half acre and total use no greater than 13,000 gallons per day. There is a second prong for any other purpose at no more than 2.8 acre-feet per year. Cross either limit in the first prong and you need a water right.
Idaho Code § 42-111 · IDWR domestic exemption page · verified August 26, 2026